Garden Level - West Wing
/The garden level in the west wing has been excavated to allow for the installation of mechanical piping beneath the floor.
Mechanical piping has been installed below the floor in the west wing of the garden level.
The garden level in the west wing has been excavated to allow for the installation of mechanical piping beneath the floor.
Mechanical piping has been installed below the floor in the west wing of the garden level.